Innovation and technology drive, open a new era of intelligent charging
With the popularity of electric vehicles sweeping the world, a high-performance and easy-to-deploy charging device is becoming an urgent need for users. This 20kW wall-mounted DC charging pile integrates advanced power electronic technology and intelligent management platform, greatly improving the overall charging efficiency and enhancing the safety factor. The compact and efficient fuselage structure can match the diversified installation environment and is an important part of building a low-carbon smart city.
Efficient and stable energy supply tool
for the electric vehicle group frequently used in the city, this DC fast charging pile is equipped with a strong power core, which greatly reduces the time-consuming of a single charge on the premise of ensuring stable current transmission. Whether it's a ride-hailing driver or a corporate fleet manager, it's an ideal balance between higher operational efficiency and lower downtime losses. At the same time, selected industrial-grade components to build a solid and durable quality foundation, enduring service in the high-intensity electricity scene.
Full coverage of flexible application scenarios for seamless access experience
whether you are in the underground garage of a residential area, the parking area outside a large shopping mall, or the supporting space of a high-end office building, this wall-mounted machine can be easily integrated into the existing building facilities. The intuitive operation interface combined with the automatic identification and starting mechanism enables even new users who come into contact for the first time to quickly master all the process steps, completely bid farewell to the complicated and complicated traditional interaction mode, and enjoy a convenient and worry-free environmental driving life.
Simplify the installation process and save space resources
Different from the traditional floor-standing design which occupies a large area, we introduce a fixed wall structure to maximize the volume control, thus releasing more valuable public land for other uses. The whole set of equipment is equipped with detailed construction guidance documents and a full range of necessary components. The assembly and debugging operations can be successfully completed only by following the standard procedures, greatly reducing the input threshold of manpower and material resources, and is especially suitable for large-scale layout tasks under the condition of transforming existing properties.
Smart Interconnection Enables Future Transportation Ecological Construction
the built-in network communication unit enables each terminal to have remote access capability. users can control the current working status, set the predetermined time period and even check the historical bill details at any time through the smart phone application. For enterprises and organizations that need to finely control power consumption, the back-end big data center will also regularly push energy consumption statistics charts and related suggestions to assist management in scientifically adjusting the direction of resource allocation and jointly moving towards a bright vision of zero carbon emissions.